Item JNS013260001
SEPTA UNIVERSITY SIGNAGE – PROJECT MANAGEMENT, DESIGN, ENGINEERING, FABRICATION, SUPPLY, & INSTALLATION – MATERIAL TO BE SUPPLIED AND INSTALLED PER SEPTA SPECIFICATIONS AND DRAWINGS – *INSTALLATION IS TO BE PERFORMED PER PREVAILING WAGE RATES – *INSTALLATION TO BE COMPLETED ON OR BEFORE 02/26/27 – WORK WILL BE COMPLETED AT: THE
WANNAMAKER BUILDING *SEPTA UNIVERSITY -5TH FLOOR 100 E. PENN SQUARE PHILADELPHIA, PA 19106
Contact: Daniel Clegg
Email: [email protected]
Phone: 215-580-7610
ePS Closing Date and Time: 1:00 pm November 23, 2026
Category: Quotes
Status: Open