General Public
May 16, 2024, at 5:30 pm
Remote meeting
Open to the public
Attending Online via Webex
Registration Link (expired)
About the Meeting
Project Overview
This project includes the replacement of the Overhead Catenary System (OCS) (train electrification) along with other infrastructure improvements from the eastern limits of the William H. Gray III 30th Street Station, through the existing SEPTA Powelton Yard, extending westerly to the limits of Mantua Avenue & 37th Street. Learn more about the project timeframe and location.
Project Objectives
- Replacement of Aging Railroad Infrastructure
- Improved System Resilience
- Improved System Reliability
- Operational Enhancements
- Drainage Improvements
- Reduction in Rail Service Disruptions