Market-Frankford Subway Elevated (MFSE) Automatic Train Control (ATC) Replacement Project Industry Forum

Time and Date:
Until: 3 pm

Location:
*In Person: SEPTA Office
1234 Market Street
3rd Floor Conference Room
Philadelphia, PA 19107
Virtual: Webex, Registration Required

Links:

SEPTA cordially invites contractors and vendors to an outreach forum in preparation for the upcoming procurement opportunity related to the MFSE ATC Replacement Project.

Description of Project & Contract Opportunity

The existing Automatic Train Control (ATC) system in service on the Market-Frankford Subway Elevated (MFSE) is approaching its end of life and SEPTA is planning for its replacement.

The current ATC system was completed in 2003 as part of a major upgrade of the MFSE that included extensive improvements to the elevated structure. This project aims to replace the current ATC system.

SEPTA will use this Forum to provide preliminary details about the project and create excitement about this upcoming procurement. This meeting offers an informal forum for questions. Some areas of this procurement include (but are not limited to):

  • Replacement of the Existing Train Control System
  • Track Work
  • Train Control Communications System
  • Train Control System Facilities
  • Rail Operations Control Center

Stay informed by viewing SEPTA’s Bid & Quote Opportunities page.

*Please arrive at least 15 minutes early to gain access through the security desk (photo ID required).