Crews will replace the Overhead Catenary System (OCS) (train electrification), along with other infrastructure improvements. The replacement should result in increasing resiliency and reliability of SEPTA’s system, as well as increase SEPTA’s operation flexibility.

Improvements will be made to SEPTA’s four revenue operating tracks, Track 1 through Track 4, carrying service on the Paoli/Thorndale Line, Cynwyd Line, Chestnut Hill West Line, and the Trenton Line. There are also 17 yard tracks within Powelton Yard that will be improved; additional yard expansion tracks will aid construction. Infrastructure improvements will be made to repair original retaining walls through the project limits, along with drainage and repairs to the 36th Street tunnel.

May 16 Project Webinar Recording

Project Webinar Recording

Project Location and Timeframe

The work will take place from the eastern limits of the William H. Gray III 30th Street Station through the existing SEPTA Powelton Yard, extending westerly to the limits of Mantua Avenue & 37th Street.

Construction is set to start September 2024; estimated project completion is 2033.

Project Objectives

  • Replacement of Aging Railroad Infrastructure
  • Improved System Resilience
  • Improved System Reliability
  • Operational Enhancements
  • Drainage Improvements
  • Reduction in Rail Service Disruptions